Constructing the tunnel

To pour the concrete in the Strachan Avenue tunnel in Toronto, the formwork was de-moulded and then moved to the front end on rails—similar to a slip form system. Unlike the continuous pouring a true slip form system allows, each section was poured separately and allowed to harden before the formwork could be moved ahead for the next pour. Photos courtesy Kryton International Inc.