Building bigger sewers to accommodate growth
The Greater Toronto Area (GTA) suburbs of Markham and Pickering represent a growing area. A trunk sewer, approximately 14 km (8 mi) in length, was contracted to accommodate the additional flows. The sewer is to be constructed at depths of 5 to 40 m (16 to 131 ft) below the ground surface. A customized benching formwork was employed.