Design of concrete for moisture-sensitive floorcoverings
Most floorcovering failures result from design mistakes, lack of groundwater barriers, and placement of the material before concrete has dried to safe levels. Therefore, all members of the project team must collaborate at every stage, such as the design, placement, curing, and relative humidity (RH) testing of the concrete.