George Brown’s mass timber building reaches construction milestone
Limberlost Place, one of Ontario’s first mass timber, net-zero carbon emissions institutional building, has now reached the highest point in its construction. The final wood and steel beams were installed in the 10-storey facility located at George Brown College’s (GBC’s) Waterfront campus in Toronto.