by mbuckstein | August 7, 2013 9:40 am
Earlier this summer, renovations to Quinte Health Care Belleville General hospital in Ontario were completed.
Designed by Kasian Architecture Ontario Incorporated, the $32-million renovation and expansion of Belleville General’s ER and lab departments added 7432 m2 (80,000 sf) of new space. Additionally, areas were established for services including:
Phases Two and Three were wrapped up with these new developments, while Phase One was completed by Kasian in 2010, with a $75-million renovation and addition of the Charlotte Sills Wing.
All three phases employed evidence-based design (EBD) methods with a focus on improving the patient/family and staff experience, and increasing natural daylighting. Lean design processes also resulted in standardized clinical rooms maximizing patient privacy, and optimizing flow throughout.
Source URL: https://www.constructioncanada.net/er-and-lab-addition-complete-on-ontario-hospital-project/
Copyright ©2025 Construction Canada unless otherwise noted.