by nithya_caleb | April 17, 2018 9:16 am
On Thursday, April 26, CSC’s Regina Chapter[1] will be conducting a tour of the College Building[2] at College Avenue Campus[3] (CAC) of the University of Regina[4]. CAC serves approximately 8000 learners and hosts dozens of community and cultural events annually.
Deteriorating facility conditions necessitated the demolition of the Conservatory and Gallery Buildings at CAC. Saving the College Building is a $60 million project—including a $27.6 million contribution from the federal government’s Strategic Investment Fund—and involves renovations to the College and Tower buildings as well as the Conservatory façade.
The new design includes:
Participants must wear protective equipment including safety boots and glasses and hard hat during the tour, which is slated to run from 5:30 to 8:30 p.m.
Following the tour, the 2018 CSC Regina Chapter Annual General Meeting will be held at Victoria’s Tavern[5].
To register for the tour, click here[6].
Source URL: https://www.constructioncanada.net/csc-regina-tours-campus-construction-project/
Copyright ©2025 Construction Canada unless otherwise noted.