3.6-DTx5WWDVwAAY-u-Fast-Epp

The cross-laminated timber (CLT) wall panels of the Whistler Community Services Society (WCSS) building in B.C., together with the elevator and stair cores, run from grade beam to eaves, as in balloon frame construction. The panels were lifted off the truck and lowered directly into place. Photo courtesy Fast + Epp

The cross-laminated timber (CLT) wall panels of the Whistler Community Services Society (WCSS) building in B.C., together with the elevator and stair cores, run from grade beam to eaves, as in balloon frame construction. The panels were lifted off the truck and lowered directly into place. Photo courtesy Fast + Epp

Leave a Comment

Comments

Your email address will not be published. Required fields are marked *